The VIF company carries out static load testing of soils using piles, applying the anchoring method to anchor piles, or anchoring a stand using a stand loaded with ballast.
The company has equipment and stands for testing soils with piles with loads from 5 to 1000 tons.
When statically testing soils with piles according to the standard DBN method,, mostly, method of loading them using steel thrust beams, connected to anchor piles, or a stand loaded with concrete ballast.
The number of anchor piles, or concrete ballast depends on the value of the indentation load on the test pile.