Drilling of leader wells

 

Drilling of leader wells (Leader drilling) performed to facilitate the immersion process, before pressing or clogging piles.

Equipment can be a separate mechanism, for example, on a car crane or caterpillar. May be complete with the installation that presses piles.

Brown power from 15 kW to 100 kW. The depth of leader drilling to 12 m (In some cases before 16 m). The diameter of the auger is selected individually and can be 200…400 mm.

The speed and cost of leader drilling depends on many factors, including from soil composition, that is mowed, depth of leader drilling, auger diameter.

 

Our company has any of the existing types of equipment to perform the leader drilling.