Pile work and foundation

Pile work and erection of the foundation – This is the main activity of the enterprise.

Including:

   - implementation of the finished foundation project, or individual training of the project by our specialists, followed by its subsequent turnkey implementation;

   - Studies of existing foundations and turnkey reconstruction.

 

To prepare a proposal to you, We need the following information:

1. Results of engineering and geological surveys (geological and).

2. Pile field and foundation project.

3. Master plan with planting the building on the site and topography.

4. Information about the availability of a power grid, its power, or the need for a generator.

 

After studying the information received, We provide you with a preliminary commercial offer. A more accurate offer is prepared after the departure and inspection of the object.

We are also ready to offer preparatory services., earthy, monolithic works of the zero cycle.

 

 

On the sitefundament-ua ® You can find additional information on the construction of foundations, soil testing, reinforcement of foundations and other foundation robots.

No Responses

    Leave a Reply